Submission to Directorate of Energy on Failure of Safety Control and Impact Monitoring in Hydroprojects

6th December 2015

To

Principal Secretary

Directorate of Energy

Shimla

Subject: Failure of Safety Control and Monitoring of Impacts in Hydropower Projects

Sir,

It is with great concern that we are writing this memorandum to you for your urgent perusal and action. As you are aware, in the last two weeks a half a dozen lives have been lost in the Kinnaur region alone in three separate incidents that have one thing in common – accidents at hydropower project sites. The first event took place in Burang village on the 18th of November 2015 where a penstock pipe burst of the 100 MW Sorang Hydro-electric project led to the death of three people. On 29th November, two labourers died in blasting operations in the 450 MW Shongthong Karchham project, some others were seriously injured. And on the same day in the Bhabha Valley, a young teacher lost her life in a landslide that occurred in the area. Even now more lives are at stake – Four days after the Sorang project disaster on 22nd November, a massive landslide occurred in Chagaon Village, located on the alignment of the Karchham Wangtoo project’s tunnel. While houses and property was damaged fortunately there were no fatalities. More of the area is likely to slide soon. Residents of Panvi Panchayat from Kinnaur carried out a demonstration last week at Shimla protesting the cracks in their houses due to the underground construction by the 9 MW Ralla-Taranda project.

In the above context we would like to raise the following questions and issues…..

Download full memorandum here:

Safety Issues Memorandum 6th Dec final

Post Author: Admin